The Svishtov facility is designed as a regional Tier III+ data center with capacity of up to 50 MW IT load. Positioned along the Danube corridor, it provides edge connectivity and supports regional enterprises with scalable infrastructure. The design focuses on energy efficiency, resilient grid interconnects, and sustainable operations, ensuring long-term value for both local and international clients.
Q4 2025 – Ongoing
Regional / Edge Data Center
50 MW IT Load
≤ Tier III+