Vidin Data Center Campus — Project Overview

Hyperscale-ready campus in Vidin, Bulgaria, master-planned for up to 308 MW IT and 100,000 m² white space. Tier III/IV design objectives, high-efficiency power and cooling (incl. river-assisted strategies), expandable grid interconnects, and phased delivery under EPC/DBO models—engineered for reliability, scalability, and best-in-class PUE.

  • Status

    Q4 2025 – Ongoing

  • Project Type

    Hyperscale Data Center Campus

  • Capacity

    308 MW IT Load

  • PUE Target

    ≤ 1.18

Interesting facts in
Development

The Vidin campus is master-planned as a hyperscale-ready platform with phased capacity expansion and a utility-first approach. The site integrates robust grid interconnects with renewable and sustainable energy sources, ensuring a balanced green power mix. Advanced cooling strategies — including river-assisted and adiabatic systems — are engineered to minimize water and power consumption, driving best-in-class reliability, scalability, and industry-leading PUE.
  • Master-planned for up to 308 MW IT with expandable ≥500 MW grid access
  • Tier III/IV design objectives with redundant MV, UPS, on-site generators, and BESS
  • High-efficiency cooling (free/adiabatic; river-assisted) targeting PUE ≤ 1.18
  • Dual diverse fiber corridors with carrier-neutral interconnect strategy